Payne Lake Auxiliary Spillway Repair #65499
Repair of auxiliary concrete spillway and metal debris rack to fix the internal erosion of soils beneath and beside the spillway that pose a major threat to the long-term viability and continued safe function of the spillway.
Sorry, the Project #65499 Public Reading Room is not active.